|
Measurement and Verification
LEED 2.2 Requirements:
• Develop and implement a Measurement & Verification (M&V) Plan consistent with Option D: Calibrated Simulation (Savings Estimation Method 2), or Option B: Energy Conservation Measure Isolation, as specified in the International Performance Measurement & Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction, April, 2003.
• The M&V period shall cover a period of no less than one year of post-construction occupancy.
Submittals (CONSTRUCTION):
- Indicate the IPMVP Option (D or B) pursued by the project.
- Indicate that the M&V Plan is consistent with the referenced option.
- Upload a copy of the M&V Plan.
- Provide a detailed narrative describing the design method (CIBSE Method / Analytic Model) utilized in determining the natural ventilation design for the project. Provide specific information regarding calculation methodology and/or model results to demonstrate that the ventilation design complies with the referenced standards. AND (For Projects With Special Circumstances)
- Provide an optional narrative to describe any additional comments or notes regarding special circumstances or considerations regarding the project's credit approach. |