Email Newsletter icon, E-mail Newsletter icon, Email List icon, E-mail List iconEmail Sign Up:
SEARCH
-->
Search
GO
 
QUICK LINK

Fundamental Refrigerant Management

LEED 2.2 Requirements:

Zero use of CFC-based refrigerants in new base building HVAC&R systems. When reusing existing base building HVAC equipment, complete a comprehensive CFC phase-out conversion prior to project completion. Phase-out plans extending beyond the project completion date will be considered on their merits.

Submittals (DESIGN):

Please provide the following project data and calculation information based on the appropriate compliance path:

Option 1 - Zero Use of CFC Refrigerants
- Confirm that the project does not use CFC refrigerants.

Option 2 - Phase out Plan
- Confirm that the project has a phase-out plan for any existing CFC-based equipment.
- Provide a narrative description of the phase-out plan, including dates and refrigerant quantities as a percentage of the overall project equipment. AND (For Projects With Special Circumstances)
- Provide an optional narrative to describe any additional comments or notes regarding special circumstances or considerations regarding the project's prerequisite approach.

 

ENERGY AND ATMOSPHERE
EA PR1 Fundamental Commissioning of the Building Energy Systems
EA PR2 Minimum Energy Performance
EA PR3 Fundamental Refrigerant Management
EA 1 Optimize Energy Performance
EA 2 On-Site Renewable Energy
EA 3 Enhanced Commissioning
EA 4 Enhanced Refrigerant Management
EA 5 Measurement and Verification
EA 6 Green Power
 
 
The Vision and Mission of the Central Texas - Balcones Chapter
Vision: Buildings and communities will regenerate and sustain the health and vitality of all life.
Mission: Accelerate the transformation toward sustainable building and land development practices in Central and South Texas through innovation, education, advocacy and partnerships.
USGBC CENTRAL TEXAS - BALCONES
Copyright © Central Texas - Balcones Chapter U.S. Green Building Council. All Rights Reserved
USGBC