Recycled Content: 10% (post-consumer + 1/2 pre-consumer)
LEED 2.2 Requirements:
Use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes at least 10% (based on cost) of the total value of the materials in the project. The recycled content value of a material assembly shall be determined by weight. The recycled fraction of the assembly is then multiplied by the cost of assembly to determine the recycled content value. Mechanical, electrical and plumbing components and specialty items such as elevators shall not be included in this calculation. Only include materials permanently installed in the project. Furniture may be included, providing it is included consistently in MR Credits 3–7. Recycled content shall be defined in accordance with the International Organization of Standards document, ISO 14021—Environmental labels and declarations - Self-declared environmental claims (Type II environmental labeling).
Post-consumer material is defined as waste material generated by households or by commercial, industrial and institutional facilities in their role as end-users of the product, which can no longer be used for its intended purpose. Pre-consumer material is defined as material diverted from the waste stream during the manufacturing process. Excluded is reutilization of materials such as rework, regrind or scrap generated in a process and capable of being reclaimed within the same process that generated it.
Submittals (CONSTRUCTION):
- Provide the total construction costs for Divisions 2-10 to apply the 45% default materials value or the actual materials cost (Divisions 2-10).
- Provide a tabulation of each material used on the project that is being tracked for recycled content. The tabulation must include a description of the material, the manufacturer of the material, the product cost, the pre-consumer and/or post-consumer recycled content percentage, and the source of the recycled content data. AND (For Projects With Special Circumstances)
- Provide an optional narrative to describe any additional comments or notes regarding special circumstances or considerations regarding the project's credit approach. |