Regional Materials: 10% Extracted, Processed & Manufactured Regionally
LEED 2.2 Requirements:
Use building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10% (based on cost) of the total materials value. If only a fraction of a product or material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value. Mechanical, electrical and plumbing components and specialty items such as elevators and equipment shall not be included in this calculation. Only include materials permanently installed in the project. Furniture may be included, providing it is included consistently in MR Credits 3–7.
Submittals (CONSTRUCTION):
- Provide the total construction costs for Divisions 2-10 to apply the 45% default materials value or the actual materials cost (Divisions 2-10).
- Complete the regional materials calculation table in the Submittal Template. The following information will be required to fill in this table: product name for each tracked material; material manufacturer; total product cost for each tracked material; percentage of product, by weight, that meets both the extraction and manufacture criteria; distance between the project site and extraction/harvest/recovery site; distance between the project site and the final manufacturing location; and harvest/manufacture location information source. AND (For Projects With Special Circumstances)
- Provide an optional narrative to describe any additional comments or notes regarding special circumstances or considerations regarding the project's credit approach. |